Construction Update


Last time we shared the floor, this time it's all about the roof. In this shot, the

construction team was getting all the duct work, electrical and plumbing up through the roof on the second floor to get the chiller ready for action. The plumbing is wrapping up now, and our final electrical work is getting started.



Inside, Tom is getting all the fittings assembled which bring all the major pieces of the brewing system together. Below is the Braumeister with it inlet and outlet fittings cut, measured and attached for a nice, clean look and efficient operation.

Cheers to beers!

-g